Skip to content
UAS London: Aerial Intelligence, London Focus
0
UAS London at 51.5074° N, 0.1278° W

Drone Mapping in EC2Y

From single visits to scheduled programmes, we deliver drone mapping throughout EC2Y.

Our drone mapping work reaches every part of EC2Y. Work here covers marketing, records, planning support and condition monitoring. Access constraints in EC2Y are worth telling us about early, because they change the plan.

The point of drone mapping is usually a decision someone else needs to make. Every London district has its own mix of obstacles, and EC2Y is no exception. We hold current airspace knowledge for East Central London as a whole, EC2Y included.

Planning for EC2Y covers airspace class, nearby aerodromes, and anything on the ground that changes the risk picture. Everything is captured at the highest quality the job can actually use. Crew brief happens on site, in front of whoever is responsible for the ground.

Insurance certificates and CAA documentation are issued on request ahead of any EC2Y booking. Raw files come back the same day, with edited output typically inside 24 to 48 hours. Where a second visit is our fault, it is at our cost.

What's Included

Digital twin creation
Thermal mapping
Environmental monitoring
Urban planning support
Historical documentation
Multi-spectral imaging

Get a Quote for EC2Y

Get in touch to discuss your drone mapping requirements in EC2Y.

Request Quote
RegulatoryCAA approved operator
Insurance£10M public liability
Experience1,000+ flight hours in London airspace
AirspaceNATS permissions for central London operations
RegisteredUAS London Limited · 16148461

Frequently Asked Questions

Can you work around a live site in EC2Y?

Yes. We plan around access routes, working hours and pedestrian movement, and can schedule flights for quieter windows to keep ground risk down. Cordons and marshalling are agreed in advance rather than arranged on the day.

How long will you be on site in EC2Y?

Most single-subject jobs take one to three hours on site including setup, briefing and packing down. Larger sites, multiple elevations or survey work take longer, and we confirm the expected window when we quote.

How much notice do you need for a booking in EC2Y?

A few days is comfortable for most EC2Y sites, and we can often cover urgent work at shorter notice. Jobs needing NATS or ATC coordination, or access to a restricted site, need longer, and we will flag that as soon as we see the brief.