Skip to content
UAS London: Aerial Intelligence, London Focus
0
UAS London at 51.5074° N, 0.1278° W

Roof & Asset Condition Surveys in RM3

Roof & asset condition surveys in RM3, quoted per job and delivered to a spec you agree up front.

Our pilots work in RM3 often enough to know its airspace constraints before we arrive. We handle both one-off commissions and scheduled repeat visits for ongoing projects. Access constraints in RM3 are worth telling us about early, because they change the plan.

An aerial set of the site gives you context that a street-level photograph loses. Where RM3 sits under a flight path, timings matter more than usual. Anything we can do elsewhere in Romford we can do in RM3.

Every flight in RM3 starts with an airspace check and a written risk assessment. Two-operator setups are available where the shot needs independent camera control. Neighbouring properties are considered before the flight path is set.

All flights are logged, and we keep the records available for your compliance file. Turnaround is same-day for raw material and 24 to 48 hours for edits, maps or reports. We flag anything that could delay the RM3 shoot as soon as we spot it.

What's Included

Detailed roof and facade condition
Defect and anomaly identification
High-zoom structural analysis
Safer than rope access
Pre-acquisition survey support
Dilapidation reporting

Get a Quote for RM3

Get in touch to discuss your roof & asset condition surveys requirements in RM3.

Request Quote
RegulatoryCAA approved operator
Insurance£10M public liability
Experience1,000+ flight hours in London airspace
AirspaceNATS permissions for central London operations
RegisteredUAS London Limited · 16148461

Frequently Asked Questions

Are you insured, and can we see the certificate?

Yes. We carry £10M public liability insurance and can send the certificate, our CAA operational authorisation and a job-specific risk assessment before the booking is confirmed.

What do we actually receive at the end?

That depends on the brief: graded video, high-resolution stills, orthomosaic maps, 3D models or an inspection report. Raw capture is handed over on the day and finished output follows by secure cloud transfer.

How much notice do you need for a booking in RM3?

A few days is comfortable for most RM3 sites, and we can often cover urgent work at shorter notice. Jobs needing NATS or ATC coordination, or access to a restricted site, need longer, and we will flag that as soon as we see the brief.