Skip to content
UAS London: Aerial Intelligence, London Focus
0
UAS London at 51.5074° N, 0.1278° W

Construction Site Mapping in HA3

HA3 is inside our regular patch, so construction site mapping there is a short mobilisation rather than a special arrangement.

Getting a crew into HA3 is a short job for us rather than a special arrangement. Our clients here tend to be developers, contractors, architects and creative agencies. We are happy to work alongside a ground photographer or video crew already on site.

Most HA3 clients are after material they can put straight in front of someone. Tall structures around HA3 affect both signal and wind, and we plan for both. We work the whole of Harrow, so HA3 is rarely a standalone trip.

The HA3 plan starts from what is on the ground, not from a standard template. For confined sites we can drop to sub-250g aircraft without giving up image quality. Where children or the general public are present, the plan accounts for them explicitly.

Where compliance evidence is needed for a planning or insurance file, we supply it. Turnaround is same-day for raw material and 24 to 48 hours for edits, maps or reports. We would rather explain a constraint up front than surprise you with it later.

What's Included

High-frequency site updates
Measurable orthomosaic maps
Digital Elevation Models (DEM)
CAD and BIM integration
Sub-centimetre RTK accuracy
Logistics and planning support

Get a Quote for HA3

Get in touch to discuss your construction site mapping requirements in HA3.

Request Quote
RegulatoryCAA approved operator
Insurance£10M public liability
Experience1,000+ flight hours in London airspace
AirspaceNATS permissions for central London operations
RegisteredUAS London Limited · 16148461

Frequently Asked Questions

Do you retain copyright, or do we?

Licensing is agreed before the shoot and written into the quote, so there is no ambiguity afterwards. Tell us how you intend to use the material and we will scope the licence to match.

Do we need permission from the landowner or council?

Take-off and landing need the landowner's permission, and we will tell you whose it is before the date. Where a council, managing agent or estate needs sight of our CAA authorisation, insurance or risk assessment, we supply the paperwork directly.

How much notice do you need for a booking in HA3?

A few days is comfortable for most HA3 sites, and we can often cover urgent work at shorter notice. Jobs needing NATS or ATC coordination, or access to a restricted site, need longer, and we will flag that as soon as we see the brief.