Skip to content
UAS London: Aerial Intelligence, London Focus
0
UAS London at 51.5074° N, 0.1278° W

Construction Progress Monitoring in EC2M

Our construction progress monitoring operations reach every part of EC2M, with raw files back the same day and edits inside 48 hours.

Recent Work

Selected work from across London and the Thames.

If your site falls in EC2M, our construction progress monitoring team can plan and fly it under existing CAA permissions. Work here covers marketing, records, planning support and condition monitoring. If the brief is still loose, we would rather talk it through than guess at it.

Height changes what the site communicates: context, scale and progress all read differently. Traffic, pedestrians and overhead services in EC2M shape the plan as much as the regulations do. Clients in EC2M often have sites elsewhere in East Central London, and we can cover both on one mobilisation.

Every flight in EC2M starts with an airspace check and a written risk assessment. Where the output is data rather than footage, we fly RTK-equipped platforms for survey-grade accuracy. We fly the plan that was agreed, and flag it if the site has changed since.

We are happy to be added to a principal contractor's approved supplier list. Raw files come back the same day, with edited output typically inside 24 to 48 hours. Where a second visit is our fault, it is at our cost.

What's Included

Scheduled weekly or monthly visits
Consistent GPS-locked viewpoints
High-res timeline documentation
Stakeholder presentation ready
CSCS cardholder pilots
Secure cloud delivery

Get a Quote for EC2M

Get in touch to discuss your construction progress monitoring requirements in EC2M.

Request Quote
RegulatoryCAA approved operator
Insurance£10M public liability
Experience1,000+ flight hours in London airspace
AirspaceNATS permissions for central London operations
RegisteredUAS London Limited · 16148461

Frequently Asked Questions

What happens if the weather is bad on the day?

We monitor forecasts in the days before the flight and will tell you early if it looks marginal. If conditions make the flight unsafe we rebook the next clear window at no extra cost.

Do you retain copyright, or do we?

Licensing is agreed before the shoot and written into the quote, so there is no ambiguity afterwards. Tell us how you intend to use the material and we will scope the licence to match.

What does a shoot in EC2M cost?

Price depends on the site, the flight time and the deliverables, so we quote per job rather than from a rate card. Send us the EC2M address and a short brief and we will come back with a fixed, obligation-free price.