Skip to content
UAS London: Aerial Intelligence, London Focus
0
UAS London at 51.5074° N, 0.1278° W

Construction Progress Monitoring in EC1A

We cover EC1A for construction progress monitoring, with the airspace checks, risk assessment and clearances handled before the crew arrives.

Recent Work

Selected work from across London and the Thames.

Our construction progress monitoring work in EC1A spans everything from single-shoot jobs to repeat site visits. Jobs come in from main contractors, subcontractors and the client side directly. Scheduling is flexible. Early starts and weekend slots are both available.

A single well-planned flight over the site often replaces a day of access equipment. Traffic, pedestrians and overhead services in EC1A shape the plan as much as the regulations do. We work the whole of East Central London, so EC1A is rarely a standalone trip.

Planning for EC1A covers airspace class, nearby aerodromes, and anything on the ground that changes the risk picture. On site we match the platform to the job, using cinema rigs for filming and RTK systems where survey accuracy matters. If conditions change on the day, the pilot's call is final.

All flights are logged, and we keep the records available for your compliance file. Raw files come back the same day, with edited output typically inside 24 to 48 hours. Feedback on a first cut is included rather than billed as a revision.

What's Included

Scheduled weekly or monthly visits
Consistent GPS-locked viewpoints
High-res timeline documentation
Stakeholder presentation ready
CSCS cardholder pilots
Secure cloud delivery

Get a Quote for EC1A

Get in touch to discuss your construction progress monitoring requirements in EC1A.

Request Quote
RegulatoryCAA approved operator
Insurance£10M public liability
Experience1,000+ flight hours in London airspace
AirspaceNATS permissions for central London operations
RegisteredUAS London Limited · 16148461

Frequently Asked Questions

How quickly can you deliver?

We offer same-day turnaround for urgent projects. Standard delivery is within 24-48 hours.

How much notice do you need for a booking in EC1A?

A few days is comfortable for most EC1A sites, and we can often cover urgent work at shorter notice. Jobs needing NATS or ATC coordination, or access to a restricted site, need longer, and we will flag that as soon as we see the brief.

Do you retain copyright, or do we?

Licensing is agreed before the shoot and written into the quote, so there is no ambiguity afterwards. Tell us how you intend to use the material and we will scope the licence to match.