Skip to content
UAS London: Aerial Intelligence, London Focus
0
UAS London at 51.5074° N, 0.1278° W

Construction Progress Monitoring in CR6

CR6 is inside our regular patch, so construction progress monitoring there is a short mobilisation rather than a special arrangement.

Recent Work

Selected work from across London and the Thames.

Getting a crew into CR6 is a short job for us rather than a special arrangement. Jobs come in from main contractors, subcontractors and the client side directly. Scheduling is flexible. Early starts and weekend slots are both available.

We plan construction progress monitoring around the output you need rather than the shots that look impressive. Operating in CR6 is a different problem to operating on open ground, and it is planned that way. CR6 is grouped with the rest of Croydon on our scheduling, which keeps mobilisation costs down.

Every flight in CR6 starts with an airspace check and a written risk assessment. Depending on the deliverable that might be the Inspire 3 for 8K, a Mavic for reach, or a Matrice for mapping. We fly the plan that was agreed, and flag it if the site has changed since.

Our permissions and £10M public liability cover apply to all work in CR6. Turnaround is same-day for raw material and 24 to 48 hours for edits, maps or reports. Questions get answered by someone who has actually flown the site.

What's Included

Scheduled weekly or monthly visits
Consistent GPS-locked viewpoints
High-res timeline documentation
Stakeholder presentation ready
CSCS cardholder pilots
Secure cloud delivery

Get a Quote for CR6

Get in touch to discuss your construction progress monitoring requirements in CR6.

Request Quote
RegulatoryCAA approved operator
Insurance£10M public liability
Experience1,000+ flight hours in London airspace
AirspaceNATS permissions for central London operations
RegisteredUAS London Limited · 16148461

Frequently Asked Questions

Do you retain copyright, or do we?

Licensing is agreed before the shoot and written into the quote, so there is no ambiguity afterwards. Tell us how you intend to use the material and we will scope the licence to match.

How much notice do you need for a booking in CR6?

A few days is comfortable for most CR6 sites, and we can often cover urgent work at shorter notice. Jobs needing NATS or ATC coordination, or access to a restricted site, need longer, and we will flag that as soon as we see the brief.

What does a shoot in CR6 cost?

Price depends on the site, the flight time and the deliverables, so we quote per job rather than from a rate card. Send us the CR6 address and a short brief and we will come back with a fixed, obligation-free price.