Skip to content
UAS London: Aerial Intelligence, London Focus
0
UAS London at 51.5074° N, 0.1278° W

Construction Drone Filming in EC3P

Tell us the EC3P site and the brief, and we will confirm what is possible before you commit.

Recent Work

Selected work from across London and the Thames.

Getting a crew into EC3P is a short job for us rather than a special arrangement. Our clients here tend to be developers, contractors, architects and creative agencies. Budgets and deadlines are easier to design around when we know them early.

Whether the EC3P material ends up in a brochure or a report changes how we shoot it. Tall structures around EC3P affect both signal and wind, and we plan for both. EC3P is grouped with the rest of East Central London on our scheduling, which keeps mobilisation costs down.

Each EC3P job is planned around the site itself: access, take-off points, overflight and people on the ground. Everything is captured at the highest quality the job can actually use. Neighbouring properties are considered before the flight path is set.

Site inductions and permit systems are no obstacle; we work to them routinely. Turnaround is same-day for raw material and 24 to 48 hours for edits, maps or reports. We do not add charges after the fact for travel or parking in EC3P.

What's Included

Weekly/monthly site progress updates
High-resolution orthomosaic overlays
3D building model tracking
BIM and project management integration
Time-lapse capture systems
CSCS cardholder pilots

Get a Quote for EC3P

Get in touch to discuss your construction drone filming requirements in EC3P.

Request Quote
RegulatoryCAA approved operator
Insurance£10M public liability
Experience1,000+ flight hours in London airspace
AirspaceNATS permissions for central London operations
RegisteredUAS London Limited · 16148461

Frequently Asked Questions

Do you need us to close anything off while you fly?

Usually not. Most jobs are flown with a small cordon around the take-off point and sensible separation from people on the ground. Where a site genuinely needs more, we will tell you at the planning stage rather than on the morning.

Do we need permission from the landowner or council?

Take-off and landing need the landowner's permission, and we will tell you whose it is before the date. Where a council, managing agent or estate needs sight of our CAA authorisation, insurance or risk assessment, we supply the paperwork directly.

Can you work around a live site in EC3P?

Yes. We plan around access routes, working hours and pedestrian movement, and can schedule flights for quieter windows to keep ground risk down. Cordons and marshalling are agreed in advance rather than arranged on the day.