Skip to content
UAS London: Aerial Intelligence, London Focus
0
UAS London at 51.5074° N, 0.1278° W

Civil Engineering Drone Surveys in RM1

Professional civil engineering drone surveys in RM1, delivered by pilots who work London's restricted airspace every week.

If your site falls in RM1, our civil engineering drone surveys team can plan and fly it under existing CAA permissions. We work for construction firms, property teams, marketing agencies and local businesses in the area. Quotes hold; we do not revise them once the job is agreed.

Whether the RM1 material ends up in a brochure or a report changes how we shoot it. Operating in RM1 is a different problem to operating on open ground, and it is planned that way. Because RM1 falls under Romford, we can usually combine it with nearby districts in one visit.

Planning for RM1 covers airspace class, nearby aerodromes, and anything on the ground that changes the risk picture. Depending on the deliverable that might be the Inspire 3 for 8K, a Mavic for reach, or a Matrice for mapping. We would rather stand down and rebook than fly a marginal operation.

Paperwork is ready before the booking is confirmed rather than chased afterwards. Larger data sets are delivered by secure transfer rather than physical media. Every job gets a written brief confirmation before we mobilise.

What's Included

Bridge and highway surveys
Marine and river civil works
Infrastructure inspections
Topographic data capture
Rail-adjacent operations
Thames PLA coordination

Get a Quote for RM1

Get in touch to discuss your civil engineering drone surveys requirements in RM1.

Request Quote
RegulatoryCAA approved operator
Insurance£10M public liability
Experience1,000+ flight hours in London airspace
AirspaceNATS permissions for central London operations
RegisteredUAS London Limited · 16148461

Frequently Asked Questions

Do we need permission from the landowner or council?

Take-off and landing need the landowner's permission, and we will tell you whose it is before the date. Where a council, managing agent or estate needs sight of our CAA authorisation, insurance or risk assessment, we supply the paperwork directly.

How long will you be on site in RM1?

Most single-subject jobs take one to three hours on site including setup, briefing and packing down. Larger sites, multiple elevations or survey work take longer, and we confirm the expected window when we quote.

What happens if the weather is bad on the day?

We monitor forecasts in the days before the flight and will tell you early if it looks marginal. If conditions make the flight unsafe we rebook the next clear window at no extra cost.