Skip to content
UAS London: Aerial Intelligence, London Focus
0
UAS London at 51.5074° N, 0.1278° W

Roof & Asset Condition Surveys in BR6

We fly roof & asset condition surveys throughout BR6, planned and permitted before the crew arrives on site.

We know the airspace picture over BR6 before we quote on it. Sites vary from tight residential streets to large commercial and industrial plots. Scheduling is flexible. Early starts and weekend slots are both available.

Good roof & asset condition surveys makes the next conversation shorter. Knowing where you can legally launch in BR6 saves a wasted mobilisation. We hold current airspace knowledge for Bromley as a whole, BR6 included.

Operations in BR6 are planned against current NOTAMs and airspace data rather than last month's. Thermal and high-zoom payloads are available where the inspection calls for them. We would rather stand down and rebook than fly a marginal operation.

Our authorisation covers the kind of built-up operation BR6 usually calls for. Raw files come back the same day, with edited output typically inside 24 to 48 hours. Feedback on a first cut is included rather than billed as a revision.

What's Included

Detailed roof and facade condition
Defect and anomaly identification
High-zoom structural analysis
Safer than rope access
Pre-acquisition survey support
Dilapidation reporting

Get a Quote for BR6

Get in touch to discuss your roof & asset condition surveys requirements in BR6.

Request Quote
RegulatoryCAA approved operator
Insurance£10M public liability
Experience1,000+ flight hours in London airspace
AirspaceNATS permissions for central London operations
RegisteredUAS London Limited · 16148461

Frequently Asked Questions

Can you fly indoors or in enclosed spaces?

Yes, with sub-250g aircraft and appropriate planning. Enclosed and confined spaces need their own risk assessment and often a different platform, so tell us about the environment early and we will confirm what is workable.

How long will you be on site in BR6?

Most single-subject jobs take one to three hours on site including setup, briefing and packing down. Larger sites, multiple elevations or survey work take longer, and we confirm the expected window when we quote.

How much notice do you need for a booking in BR6?

A few days is comfortable for most BR6 sites, and we can often cover urgent work at shorter notice. Jobs needing NATS or ATC coordination, or access to a restricted site, need longer, and we will flag that as soon as we see the brief.