Skip to content
UAS London: Aerial Intelligence, London Focus
0
UAS London at 51.5074° N, 0.1278° W
Boat Filming London at Chelsea Reach - UAS London
Thames & River Marine Services

Boat Filming London at Chelsea Reach

Specialist over-water boat filming london at Chelsea Reach for marine engineering, logistics, and creative media.

Flying at Chelsea Reach means working over moving water, tidal range and live vessel traffic. The work ranges from single vessel shoots to multi-day coverage of marine civil projects. Tell us the deadline early, because the tide table, not the diary, usually sets the date.

Every flight at Chelsea Reach is planned around the tide table and the vessel schedule. Where the shot demands it, we launch and recover from an MCA-coded support vessel. Where bank access is restricted, we scout the approach before the crew and kit arrive.

Notices to mariners are checked before any Chelsea Reach flight, and radio watch is kept during it. Failsafe return-to-home points account for drift, tide and a moving launch platform. If wind or river conditions turn on the day, the pilot's call is final.

Rushes can go out the same evening where a broadcast deadline requires it. Tell us what you need on the water and we will come back with options, tides and a price. The quickest route is a short email with the location, the subject and the deadline.

Marine Specifications in Chelsea Reach

Tidal Thames skipper and pilot crew
Bridge and pier structural inspection clearance
Full Port of London Authority (PLA) coordination
High-zoom and thermal inspection payloads
Specialist marine aviation insurance (£10M)
Georeferenced river and foreshore mapping

Book River Filming

Drone operations at Chelsea Reach require Port of London Authority clearance and skipper-coordinated flight paths.

Request River Booking

Thames Operational Specs

  • PLA Coordination Managed
  • VHF Radio Pilot Logs
  • MCA-Coded Support Vessels
  • £10M Maritime Insurance
  • GPS Tracked Over-Water Flights
  • Wind-shear resistant platforms
RegulatoryCAA approved operator
Insurance£10M public liability
Experience1,000+ flight hours in London airspace
AirspaceNATS permissions for central London operations
RegisteredUAS London Limited · 16148461

Frequently Asked Questions

How much notice do you need for river work at Chelsea Reach?

More than for a land-based shoot, because PLA notification and the tide table both constrain the date. A week or two is comfortable; tell us the deadline and we will tell you honestly whether it is achievable.

Can you launch drones directly from boats at Chelsea Reach?

Yes. Through our partnership with Cinecraft we have access to MCA-coded workboats and support vessels, and our pilots are experienced in launching and recovering from a moving deck.

How does the tide affect a shoot at Chelsea Reach?

Tide decides what is visible, what is navigable and where we can launch and recover. We plan Chelsea Reach operations around the tide table first and build the shot list around the window that gives you the best water.