Skip to content
UAS London: Aerial Intelligence, London Focus
0
UAS London at 51.5074° N, 0.1278° W

Drone Filming in EC1V

A CAA-approved, £10M-insured crew for drone filming anywhere in EC1V.

We take drone filming bookings across EC1V most weeks of the year. Briefs range from a single set of stills through to full production support. We are happy to quote two or three approaches so you can compare.

The point of drone filming is usually a decision someone else needs to make. Proximity to controlled airspace changes what is possible in parts of EC1V. EC1V sits in the East Central London postcode area, which our crews cover as one patch.

Each EC1V job is planned around the site itself: access, take-off points, overflight and people on the ground. For confined sites we can drop to sub-250g aircraft without giving up image quality. We fly the plan that was agreed, and flag it if the site has changed since.

Every operation runs under our CAA authorisation with £10M public liability cover in place. Urgent EC1V jobs can be turned around same-day where the schedule allows. You will know who is turning up in EC1V, and when, before the day.

What's Included

4K & 6K RAW aerial cinematography
CAA approved and fully insured
Same-day turnaround available
Licensed for Central London airspace
1000+ flight hours experience
Full post-production colour grading

Get a Quote for EC1V

Get in touch to discuss your drone filming requirements in EC1V.

Request Quote
RegulatoryCAA approved operator
Insurance£10M public liability
Experience1,000+ flight hours in London airspace
AirspaceNATS permissions for central London operations
RegisteredUAS London Limited · 16148461

Frequently Asked Questions

How long will you be on site in EC1V?

Most single-subject jobs take one to three hours on site including setup, briefing and packing down. Larger sites, multiple elevations or survey work take longer, and we confirm the expected window when we quote.

Do we need permission from the landowner or council?

Take-off and landing need the landowner's permission, and we will tell you whose it is before the date. Where a council, managing agent or estate needs sight of our CAA authorisation, insurance or risk assessment, we supply the paperwork directly.

How much notice do you need for a booking in EC1V?

A few days is comfortable for most EC1V sites, and we can often cover urgent work at shorter notice. Jobs needing NATS or ATC coordination, or access to a restricted site, need longer, and we will flag that as soon as we see the brief.