Skip to content
UAS London: Aerial Intelligence, London Focus
0
UAS London at 51.5074° N, 0.1278° W

Roof & Asset Condition Surveys in W10

Tell us the W10 site and the brief, and we will confirm what is possible before you commit.

We know the airspace picture over W10 before we quote on it. Typical jobs cover commercial premises, residential developments, industrial units and open sites. Small jobs are welcome; there is no minimum project size.

An aerial set of the site gives you context that a street-level photograph loses. Traffic, pedestrians and overhead services in W10 shape the plan as much as the regulations do. Sites across West London get the same crews and the same standards as W10.

The W10 operating plan is written before the crew is scheduled, not after. Kit is chosen per brief, from sub-250g aircraft for tight spaces to RTK platforms for centimetre accuracy. Our risk assessments are written to be read, not to tick a box.

Insurance certificates and CAA documentation are issued on request ahead of any W10 booking. If weather stops the flight we rebook the next clear window at no extra cost. You get one point of contact from enquiry through to delivery.

What's Included

Detailed roof and facade condition
Defect and anomaly identification
High-zoom structural analysis
Safer than rope access
Pre-acquisition survey support
Dilapidation reporting

Get a Quote for W10

Get in touch to discuss your roof & asset condition surveys requirements in W10.

Request Quote
RegulatoryCAA approved operator
Insurance£10M public liability
Experience1,000+ flight hours in London airspace
AirspaceNATS permissions for central London operations
RegisteredUAS London Limited · 16148461

Frequently Asked Questions

Can you fly drones in W10?

Yes. We hold the necessary permissions to operate safely in W10. Every operation includes a full risk assessment and coordination with local authorities or airspace controllers where required.

How long will you be on site in W10?

Most single-subject jobs take one to three hours on site including setup, briefing and packing down. Larger sites, multiple elevations or survey work take longer, and we confirm the expected window when we quote.

How much notice do you need for a booking in W10?

A few days is comfortable for most W10 sites, and we can often cover urgent work at shorter notice. Jobs needing NATS or ATC coordination, or access to a restricted site, need longer, and we will flag that as soon as we see the brief.