Skip to content
UAS London: Aerial Intelligence, London Focus
0
UAS London at 51.5074° N, 0.1278° W

Roof & Asset Condition Surveys in EN9

We cover EN9 for roof & asset condition surveys, with the airspace checks, risk assessment and clearances handled before the crew arrives.

We know the airspace picture over EN9 before we quote on it. We handle both one-off commissions and scheduled repeat visits for ongoing projects. Budgets and deadlines are easier to design around when we know them early.

The right altitude for any EN9 site depends entirely on what you are trying to show. We already know which parts of EN9 need extra lead time and which do not. Enfield is a regular working area for us, and EN9 is part of it.

Ground risk in EN9 is assessed on its own terms, street by street. Two-operator setups are available where the shot needs independent camera control. We would rather stand down and rebook than fly a marginal operation.

Site inductions and permit systems are no obstacle; we work to them routinely. You get the raw capture on the day and finished deliverables within a couple of days. Where a job runs over, we absorb it rather than reissue the invoice.

What's Included

Detailed roof and facade condition
Defect and anomaly identification
High-zoom structural analysis
Safer than rope access
Pre-acquisition survey support
Dilapidation reporting

Get a Quote for EN9

Get in touch to discuss your roof & asset condition surveys requirements in EN9.

Request Quote
RegulatoryCAA approved operator
Insurance£10M public liability
Experience1,000+ flight hours in London airspace
AirspaceNATS permissions for central London operations
RegisteredUAS London Limited · 16148461

Frequently Asked Questions

What does a shoot in EN9 cost?

Price depends on the site, the flight time and the deliverables, so we quote per job rather than from a rate card. Send us the EN9 address and a short brief and we will come back with a fixed, obligation-free price.

Do we need permission from the landowner or council?

Take-off and landing need the landowner's permission, and we will tell you whose it is before the date. Where a council, managing agent or estate needs sight of our CAA authorisation, insurance or risk assessment, we supply the paperwork directly.

What do we actually receive at the end?

That depends on the brief: graded video, high-resolution stills, orthomosaic maps, 3D models or an inspection report. Raw capture is handed over on the day and finished output follows by secure cloud transfer.