Skip to content
UAS London: Aerial Intelligence, London Focus
0
UAS London at 51.5074° N, 0.1278° W

Construction Site Mapping in N10

We cover N10 for construction site mapping, with the airspace checks, risk assessment and clearances handled before the crew arrives.

Booking construction site mapping in N10 puts a CAA-approved crew on site with the permissions already in place. Some clients book us once; others keep us on a monthly cycle. Access constraints in N10 are worth telling us about early, because they change the plan.

Clients in N10 usually need the material for marketing, a record, or a decision. Height limits, restricted zones and helicopter routes all vary across London, N10 included. Our coverage of North London means a crew can reach N10 without a long transit.

We confirm what permissions the N10 site needs before anything is booked in. We capture in RAW throughout, so there is headroom left in the grade or the processing. Neighbouring properties are considered before the flight path is set.

Insurance certificates and CAA documentation are issued on request ahead of any N10 booking. Delivery is by secure cloud transfer, with the raw files retained as backup. If we get something wrong, we go back and reshoot it.

What's Included

High-frequency site updates
Measurable orthomosaic maps
Digital Elevation Models (DEM)
CAD and BIM integration
Sub-centimetre RTK accuracy
Logistics and planning support

Get a Quote for N10

Get in touch to discuss your construction site mapping requirements in N10.

Request Quote
RegulatoryCAA approved operator
Insurance£10M public liability
Experience1,000+ flight hours in London airspace
AirspaceNATS permissions for central London operations
RegisteredUAS London Limited · 16148461

Frequently Asked Questions

What happens if the weather is bad on the day?

We monitor forecasts in the days before the flight and will tell you early if it looks marginal. If conditions make the flight unsafe we rebook the next clear window at no extra cost.

How quickly can you deliver?

We offer same-day turnaround for urgent projects. Standard delivery is within 24-48 hours.

Do you need us to close anything off while you fly?

Usually not. Most jobs are flown with a small cordon around the take-off point and sensible separation from people on the ground. Where a site genuinely needs more, we will tell you at the planning stage rather than on the morning.