Skip to content
UAS London: Aerial Intelligence, London Focus
0
UAS London at 51.5074° N, 0.1278° W

Construction Site Mapping in EN8

EN8 is inside our regular operating area. Our construction site mapping crews mobilise quickly and arrive with the paperwork already done.

EN8 is well within our operating radius, so mobilising a crew there is straightforward. Sites vary from tight residential streets to large commercial and industrial plots. If another supplier is already engaged, we can work alongside them.

Height changes what the site communicates: context, scale and progress all read differently. Traffic, pedestrians and overhead services in EN8 shape the plan as much as the regulations do. We hold current airspace knowledge for Enfield as a whole, EN8 included.

Each EN8 job is planned around the site itself: access, take-off points, overflight and people on the ground. Mapping work is flown on RTK platforms rather than estimated from camera drones. We keep the separation distances the regulations require from anyone not under our control.

Paperwork is ready before the booking is confirmed rather than chased afterwards. Urgent EN8 jobs can be turned around same-day where the schedule allows. We keep the brief and the delivery in writing so expectations stay aligned.

What's Included

High-frequency site updates
Measurable orthomosaic maps
Digital Elevation Models (DEM)
CAD and BIM integration
Sub-centimetre RTK accuracy
Logistics and planning support

Get a Quote for EN8

Get in touch to discuss your construction site mapping requirements in EN8.

Request Quote
RegulatoryCAA approved operator
Insurance£10M public liability
Experience1,000+ flight hours in London airspace
AirspaceNATS permissions for central London operations
RegisteredUAS London Limited · 16148461

Frequently Asked Questions

What does a shoot in EN8 cost?

Price depends on the site, the flight time and the deliverables, so we quote per job rather than from a rate card. Send us the EN8 address and a short brief and we will come back with a fixed, obligation-free price.

How quickly can you deliver?

We offer same-day turnaround for urgent projects. Standard delivery is within 24-48 hours.

Do we need permission from the landowner or council?

Take-off and landing need the landowner's permission, and we will tell you whose it is before the date. Where a council, managing agent or estate needs sight of our CAA authorisation, insurance or risk assessment, we supply the paperwork directly.