Skip to content
UAS London: Aerial Intelligence, London Focus
0
UAS London at 51.5074° N, 0.1278° W

Construction Site Mapping in EC2R

Construction site mapping in EC2R, quoted per job and delivered to a spec you agree up front.

We run construction site mapping jobs across EC2R throughout the year. We work for construction firms, property teams, marketing agencies and local businesses in the area. Access constraints in EC2R are worth telling us about early, because they change the plan.

We shoot construction site mapping to be used, not to fill a gallery. Local access, not airspace, is often the real constraint on work in EC2R. EC2R is grouped with the rest of East Central London on our scheduling, which keeps mobilisation costs down.

We look at obstacles, overflight and public access around the EC2R site before quoting. We fly the aircraft the brief actually needs rather than the same platform for everything. Crew brief happens on site, in front of whoever is responsible for the ground.

Permissions, insurance and the risk assessment are all available before the flight rather than after it. Send the EC2R address and the brief, and we will come back with a fixed price. We would rather explain a constraint up front than surprise you with it later.

What's Included

High-frequency site updates
Measurable orthomosaic maps
Digital Elevation Models (DEM)
CAD and BIM integration
Sub-centimetre RTK accuracy
Logistics and planning support

Get a Quote for EC2R

Get in touch to discuss your construction site mapping requirements in EC2R.

Request Quote
RegulatoryCAA approved operator
Insurance£10M public liability
Experience1,000+ flight hours in London airspace
AirspaceNATS permissions for central London operations
RegisteredUAS London Limited · 16148461

Frequently Asked Questions

Are you insured, and can we see the certificate?

Yes. We carry £10M public liability insurance and can send the certificate, our CAA operational authorisation and a job-specific risk assessment before the booking is confirmed.

How much notice do you need for a booking in EC2R?

A few days is comfortable for most EC2R sites, and we can often cover urgent work at shorter notice. Jobs needing NATS or ATC coordination, or access to a restricted site, need longer, and we will flag that as soon as we see the brief.

How long will you be on site in EC2R?

Most single-subject jobs take one to three hours on site including setup, briefing and packing down. Larger sites, multiple elevations or survey work take longer, and we confirm the expected window when we quote.