Skip to content
UAS London: Aerial Intelligence, London Focus
0
UAS London at 51.5074° N, 0.1278° W

Civil Engineering Drone Surveys in E98

E98 is inside our regular operating area. Our civil engineering drone surveys crews mobilise quickly and arrive with the paperwork already done.

Booking civil engineering drone surveys in E98 puts a CAA-approved crew on site with the permissions already in place. We are as comfortable on a single house as on a multi-acre site. Small jobs are welcome; there is no minimum project size.

Aerial work in E98 tends to answer a question that ground-level images cannot. Operating in E98 is a different problem to operating on open ground, and it is planned that way. Our coverage of East London means a crew can reach E98 without a long transit.

Ground risk in E98 is assessed on its own terms, street by street. The aircraft is chosen after the brief is understood, not before. We do not fly outside our permissions, whatever the deadline looks like.

Site inductions and permit systems are no obstacle; we work to them routinely. You get the raw capture on the day and finished deliverables within a couple of days. The same pilot who plans the E98 job is usually the one who flies it.

What's Included

Bridge and highway surveys
Marine and river civil works
Infrastructure inspections
Topographic data capture
Rail-adjacent operations
Thames PLA coordination

Get a Quote for E98

Get in touch to discuss your civil engineering drone surveys requirements in E98.

Request Quote
RegulatoryCAA approved operator
Insurance£10M public liability
Experience1,000+ flight hours in London airspace
AirspaceNATS permissions for central London operations
RegisteredUAS London Limited · 16148461

Frequently Asked Questions

What does a shoot in E98 cost?

Price depends on the site, the flight time and the deliverables, so we quote per job rather than from a rate card. Send us the E98 address and a short brief and we will come back with a fixed, obligation-free price.

Do we need permission from the landowner or council?

Take-off and landing need the landowner's permission, and we will tell you whose it is before the date. Where a council, managing agent or estate needs sight of our CAA authorisation, insurance or risk assessment, we supply the paperwork directly.

How long will you be on site in E98?

Most single-subject jobs take one to three hours on site including setup, briefing and packing down. Larger sites, multiple elevations or survey work take longer, and we confirm the expected window when we quote.